Completed Project
EMERGENCY GENERATOR AND 250AMPS MOTORIZED CIRCUIT BREAKERS + CONTROL PANEL PCB REPAIRED
EQUIPMENT TYPE: EMERGENCY GENERATOR UNIT
JOB SCOPE: EMERGENCY GENERATOR AND 250AMPS MOTORIZED CIRCUIT BREAKERS + CONTROL PANEL PCB REPAIRED
VESSEL TYPE: CONTAINER FEEDER VESSEL
MEETING WITH TECHNICAL CREW/CHIEF ENGINEER SCOPE:
We had a brief meeting with the Chief Engineer on our Strategy and plans to install the new motorized circuit breakers + control panel repaired PCB crane. All our team plans were adopted by both the chief Engineer and his team. Our Team then presented the 2-units of 250A motorized brakers brand new and the repaired one in addition to the control panel PCB, to the chief Engineer which was well received
We had a brief meeting with the Chief Engineer on our Strategy and plans to install the new motorized circuit breakers + control panel repaired PCB crane. All our team plans were adopted by both the chief Engineer and his team. Our Team then presented the 2-units of 250A motorized brakers brand new and the repaired one in addition to the control panel PCB, to the chief Engineer which was well received
MSC ORAN III EMERGENCY GENERAROR
TROUBLESHOOTING AND INSTALLATION
- Our Team of Engineers noticed incessant power fluctuation on board prior to the breaker replacement.
- The Chief Engineer was engaged to isolate ESB (Emergency switch Board) power from the MSB (Main Switch Board) for safety.
- The makeshift MCCB was decommissioned and the new Motorized Braker was installed.
- The PCB repaired on the Emergency generator panel was also installed.
- The chief Engineer was re engaged to close the circuit After MOTORIZED BRAKER Installation was completed.
NEW MOTORIZED CIRCUIT BREAKER INSTALLATION